Search Schedule From Shared Calendar. ChikkuTakku is service to search schedule from shared calendar and help share calendar
A Blue Origin New Glenn rocket will launch on its fourth? flight, carrying Firefly's Elytra Dawn OTV to orbit, which will deploy the following CubeSats for NASA's Educational Launch of Nanosatellites (ELaNa) program: AEPEX and CANVAS (ELaNa 55), R5-S3 and R5-S5. Further CubeSats manifested on New Glenn are Odyssey, IGOR, SM 2, SeaLion and UtProSat 1. New Glenn version 7×2 is equipped with seven BE-4 LNG/LOX engines on the reusable GS1 first stage and two BE-3U hydroLOX engines on the GS2 second stage. The first stage booster is designated GS1-7E03 named "No, It's Necessary". - The Elytra Dawn orbital tug is equipped with a FANTM-RiDE payload dispenser, to first deploy commercial rideshare payloads in Sun-Synchronous Orbit, and then perform an on-orbit maneuver and stand ready to deploy undisclosed U.S. government payloads on-demand for the NRO. - Delayed from mid-October, November 2024, May, August and late 2025.
📍 Space Launch Complex 36, air force station, Cape Canaveral, FL 32920, USA